There was an approximately 30 minute power outage beginning at 3:15am on Friday, 10.14.22 affecting all of Baldwin City. The infrastructure coming into town is owned by Evergy, and they switched us to a backup feed in order to fix a pole broken by the high winds. While switching back, we lost power temporarily.